Projets achevés | ABUJA / FCT / NIGERIA
İnstallation of 4 km 33kv undergorund transmission line, 1 no 15MVA 33/11kv indoor Substation,33Nos distribution transformer, low voltage distribution to the houses, 2 nos swimming pool, water and other mechanical installations